Ceme campus rainham essex

Rated 4.54/5 based on 734 customer reviews

LONDON BRIDGE Reconstruction of the London terminus was more or less completed by the end of 2017.

The massive new concourse was completed during a ten day closure of the station over the Christmas and New Year period and is as large as the Wembley football pitch.

ISLAND LINE The discussion about what can be done to keep the Ryde Pier to Shanklin line open continues.

The floor of Ryde Tunnel (twin single track bores) was raised in 1967 to reduce the risk of flooding but the resultant reduced headroom means that modern efficient rolling stock need more than the available headroom.

ceme campus rainham essex-11

ceme campus rainham essex-85

The route had been closed for several months for electrification work and a number of civil engineering improvements.

Trams to/from the northern suburbs were able to operate but the Clifton and Toton Lane lines remained closed until 1600 when more or less full tram services resumed except that the Nottingham Station stop remained closed.

ROTHERHAM Low level platforms at the Central Station for use by the tram service have now been completed and a start to the tram service is likely to be in September 2018.

NOTTINGHAM A severe fire at Nottingham Station on 12 January 2018 halted all trains and trams and resulted in the closure of roads near the station.

A £50m upgrade to the station had been completed recently and the fire was thought to be the result of arson.

Leave a Reply